Scheduled
Improvements to Darke County Roads & Bridges for 2013 By
James P. Surber P.E.,P.S., Darke County Engineer
In
addition to normal required maintenance, an estimated $2,608,456 worth
of
improvements to County roads and bridges is scheduled for 2013 that
will be 93
percent locally funded. Local funds are gas tax and license fees
returned
monthly to the County by the State of Ohio for County Highway
operations. No
real estate or sales taxes fund Darke County roads and bridges. The
County
Engineer and Highway Department are responsible for 519 miles of County
road
and 530 bridges on County and Township roads.
COUNTY
ROAD SURFACING: The following eighteen County roads which total -
30.14
miles are scheduled for new surfaces during May ‑ July at an estimated
contracted local cost of $1,640,000.
Road
Name -
From (Rd.)
- To
(Rd.)
- Length
(Mi.)
Wasson -
Ohio-Indiana
Line -
Hillgrove-Southern
- 2.96
Chenoweth -
Hollansburg-Tampico
Palestine-Hollansburg
- 0.31
Grubbs-Rex -
Arcanum-Ithaca
- Gordon-Landis -
2.03
Gettysburg-Webster -
Gettysburg
Corp. -
S.R. 185
- 4.97
Arnold -
S.
R. 571 -
Ch. Home-Bradford
- 1.09
Ch.
Home-Bradford - Arnold
- S.
R. 49 - 1.02
Burns -
S.
R. 185 -
Reed
- 2.07
Harrison -
Rush
- Hollansburg-Arcanum -
2.10
Hollansburg-Sampson -
Gordon-Landis
- Miami
Co. Line - 3.15
New
Weston-Ft. Loramie End
Twp. maintenance
S. R. 49 - 2.58
Ohio-Indiana
Line -
Wasson
- Pickett
- 1.94
Greenville-Bakers
Store -
Stingley
- S.
R. 502
- 1.74
Total -
30.60
Wabash-York -
USR
127 -
Elijah-York
- 1.52
Castine-Gordon -
S.
R. 49 -
Miami Co. Line
- 0.48
-
Old
US
36 -
USR 36
- USR
36
- 0.81 -
Clifton
Drive -
Daly
- S.
R. 571
- 0.33
Eidson -
S. R
121 -
S. R. 49
- 0.75
Ravenwood
Drive -
Ch. Home-Bradford
- dead
end
- 0.29
Total 30.14
PAVEMENT
MARKING: About 319
miles of road will
have new centerline and no‑passing markings applied, and about 350
lane‑miles
(175 road miles) will have white edge-line markings applied at a total
estimated local cost of $171,000. The project will be contracted and is
expected to require 5470 gallons of yellow paint and 5800 gallons of
white
paint. Centerline markings are estimated to cost $263 per mile and
edge-lines
at $250 per lane mile.
CULVERT
REPLACEMENT: An estimated 30 roadway culverts and 10 subsurface tile
crossings
will be replaced this year on the roads that are planned to be
resurfaced in
2014. All work will be done by County personnel and equipment, with an
estimated material cost of $28,000, and total estimated costs including
labor
and equipment of $60,000.
CRACK
SEALING: An estimated 50 miles of County Road will have pavement cracks
sealed
with hot‑applied crack sealant material by County personnel. The total
estimated cost for this work is $156,000, using an estimated $80,000 of
materials, and will be performed throughout the year.
SIGNS: About 800 new STOP signs
will be installed
this year on County Roads. The cost of the signs is estimated at
$35,500 with a
federal grant providing 80% or $28,400 of this amount. The total cost,
including hardware, labor and equipment is estimated at $60,500 and all
installation work will be done by County employees using County
equipment.
ROAD
RECONSTRUCTION: A major widening and reconstruction project will be
completed
on Frazers Road from the Preble County Line to Grubbs-Rex Road for a
length of
3 miles. The work includes culvert replacements, pavement and shoulder
widening
and overall road enhancement. The $777,525 project, now 75% complete by
Walls
Brothers Asphalt, is being substantially funded by the Ohio Public
Works
Commission with an estimated County cost in 2013 of $52,000.
Total
Estimated Road Improvement Costs: $ 2,281,880
Total
estimated local cost: $2,111,100 (93%)
BRIDGE
CONSTRUCTION/ REHABILITATION BY COUNTY EMPLOYEES:
- One
bridge superstructure will be replaced, six bridges will be
rehabilitated, and
one will be repaired by County personnel during 2013.
Road
-
Bridge
No. -
Span
- Width
- Work -
Estimated
Cost
Worth -
C281-0087
- 33’ -
28’
Superstructure Rep
$
65,247
Wasson -
C123-0211
- 92’ -
24’
Rehabilitation
- $ 44,561
Heller -
C267-0085
- 90’ -
24’
Rehabilitation
- $ 52,551
New
Madison-Coletown
C026-0628
- 88’ -
24’
Rehabilitation
- $ 40,914
Daly -
C328-0045
- 169’ -
30’
Repair
- $ 35,703
Etter -
T297-0070
- 32’ -
24’
Rehabilitation
- $ 17,928
Day -
T177-0202
- 42’ -
24’
Rehabilitation
- $ 19,774
Palestine-Union
City -
C030-0742
- 97’
- 28’ Rehabilitation -
$
49,898
Total $
326,576
(All
Local Funding)
(Force
account bridge estimates include the cost of County labor, materials
and
equipment with large overhead rates on labor and materials as required
by state
law.)
In
total, an estimated $2,608,456 of road, bridge, and culvert
improvements will
be made in 2013 to County roads and bridges on County and Township
Roads in